Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Definition of Ready ensures that the product backlog items are well-prepared, understood, and have enough information for the development team to start working on them. The criteria in the DoR may vary from team to team.

To consider the Story ready for a developer we should have this criterion already defined:

  •  Title: a clear user story title defined
  •  Description/Problem statement: a clear and concise statement that describes a specific problem to be solved or a gap to be filled.
  •  Acceptance Criteria: specific conditions or requirements that a product or feature must meet to be considered acceptable or "done" from the perspective of the stakeholders or users.
  •  Dependencies: mapped all dependencies from other teams/applications
  •  Estimates: use the specific measure to estimate the story on the macro vision
  •  Wireframes: mockups provided by the UI/UX designer
  •  Testability: comprehensive test plan created to guide the developers in executing the required tests