π οΈ Potential Solutions
Note: this section should be short and sweet, documenting notes about different solutions that were considered during ideation. Can just be a link to a whiteboard for example. Expected outcome: one solution is chosen and documented in more detail under Proposed Solution.
β Proposed Solution
Description of the proposed solution.
Potential Challenges
List here potential challenges that have come across the opportunity definition or from the potential solutions so far.
π° Cost
Describe any additional cost this solution may imply.
ποΈ Configuration
Include here any configuration required (Sanity, LaunchDarkly flags, etc.) required to enable the solution.
π Metrics
Describe the metrics that will be used to measure the solutionβs success, as well as how to measure those KPIs.
ποΈ Delivery Plan
Link to the task or list of all the tasks required to deliver the solution, along with its progress.
π§βπ QA Plan
Testing scenarios. See example /wiki/spaces/EGMT/pages/4080861189.
β οΈ Call-outs
Tip: Document here any improvement or discussion regarding the feature
Add Comment